Introduction
AIIMS Patna campus covers an area of 66.5 acres, while the total built-up area of the campus is1,67,003 square metres, including 1,21,312 square metres of hospital space and 45,691 square metres of non-hospital space. Approximately 99 percent of phase – 1 work has been completed. The institute is located in the heart of city and is surrounded by lush greenery. Patna is located on the lower bank of the Ganges, which often results in flooding and the high water level, makes construction work tedious and futile. The city is also classified as zone-IV, a high seismic zone that necessitates numerous engineering safeguards during the pre- and post-construction stages. Summer temperatures in Patna range between 35 and 45 degrees Celsius. While in the Winter months, temperatures range from -1 to 30 degrees Celsius. Precipitation occurs frequently. Patna receives an average annual rainfall of approximately 1213.3mm.
Infrastructure DevelopmentS.No. | Name of Work | Estimated Cost | Remarks |
---|---|---|---|
1 | Supply, installation, testing and commissioning of VRV/VRF system in department of Radiotherapy at OPD block & Electrical substation no-3 at AIIMS Patna | Rs. 54,32,116/- | Work in Progress |
2 | Construction of waiting hall near Trauma Building at AIIMS Patna | Rs 10,42,926/- | Work in Progress |
3 | Construction of prefabricated pre engineering building at 1st floor Mortuary Block, AIIMS Patna | Rs. 2,68,43,961/- | Work in Progress |
4 | Construction of ICU 6th floor | Rs 75,43,480/- | Work in Progress |
5 | Development of BMT (Bone Marrow Transmission) Unit at 4th Floor Connecting Corridor B/W A & B block, AIIMS Patna.) | Rs. 1,50,55,710/- | Work in Progress |
S.No. | Name of Work | Estimated Cost | Remarks |
---|---|---|---|
1 | Construction of prefabricated pre engineering building at 1st floor M.S Office & 2nd floor Blood bank, AIIMS Patna. | Rs. 3,40,61,686/- | Administrative approval received |
2 | Renovation work of Auditorium AIIMS Patna | Rs 25,42,058/- | Administrative approval received |
3 | Providing and fixing of BARBED WIRE over existing boundary wall of residential complex and girls hostel, Renovation of Ramp at Medical college, cement concrete pavement & premix carpet surfacing with bitumen at residential complex of AIIMS Patna | Rs.33,22,625/- | Administrative approval received |
4 | Development of Horticulture | - | Survey going on |
5 | Sport complex | - | Survey going on |
6 | 3 T MRI Installation | - | Survey going on |
Infrastructure
-
Services
Gallery
-
Contact Us